This screen allows you to find all the schedules that you have added for your object.
Thanks to the programming, it is possible for you to define a schedule to turn on or turn off your object. You can also activate the repetition of this action for the chosen days.
On this screen you can:
- Create a new schedule for your object.
- Access the details of a schedule.
- Activate or deactivate a schedule.
Related articles :
- Set up your dimmer switch
- Edit a time slot in a water heater schedule
- Day of the week for your water heater schedule
- Create/modify a schedule for your water heater
- Configure Your Roller Shutter
- Set up schedules for your device
- Control boiler
- Minimum operating hours
- Pairing Gateways
- Temperature calibration