Lexman: Charging Station - Product Sheet

Borne de recharge Lexman - Photo.gif

Séparateur horizontale vert.png

Prerequisites for Installation and Use:

  • Enki Application

* Prerequisites for the Enki application: Internet access and a phone with minimum operating system: Android: 7 / iOS: 15

Communication Protocol:

  • Wi-Fi

Available Countries:

  • France
  • Spain
  • Italy
  • Portugal

State Feedback Available:

  • Yes

Alexa Voice Control:

  • Not direct, but possible via manual scenarios

Google Home Voice Control:

  • Not direct, but possible via manual scenarios

Séparateur horizontale vert.png

Article Content:

 

Technical Description:

Model Reference EAN
Charging Station 7/22 kW - T2S Socket 90235808 3276007783483
Charging Station 7 kW - T2 Cable 90235807 3276007783476

 

  90235808 90235807
T2S Socket X  
Attached Cable (6.5m) with Holder   X
Single-phase* X X
Three-phase* X  
Dynamic Anti-Disconnection Load X X
Smartphone Application (Enki) X X
Connectivity Wi-Fi
Ethernet
Wi-Fi
Ethernet
OCPP 1.6J 1.6J
Remote Update X X

* Single-phase or three-phase configuration can be done during installation.

Electrical Specification Maximum power: 22 kW (3P) / 7.4 kW (1P)
Maximum current: 32A per phase, adjustable from 10A to 32A
Nominal voltage (Un): 207-253 V~ (1P), 400V~ (3P)
Operating frequency: 50 Hz
Insulation voltage (Ui): 1.5kV L to N, 2kV L to L; 4kV L,N to ground
Nominal impulse withstand voltage (Uimp): 4000 V
Nominal peak withstand current (Ipk): 1500A
Nominal short-time withstand current (Icw): 3kA
Short-circuit current (Icc): 1000A 1 ms, 3 times
Overvoltage category: III
Pollution degree: 3
Electromagnetic compatibility classification (EMC): Type B
Protection classification against electric shock: Class I
Compatible neutral system: TNC-S, TNS
Wi-Fi radio frequency band: 2.4 GHz
Maximum radio transmission power: 20 dBm
Connector T2S Socket (90235808)
Attached cable (6.5m) T2 connector (90235807)
Dynamic Anti-Disconnection Load Function TIC Interface (France)
External smart meter with RS485 interface optional (Europe)
Display LED strip indicator with dynamic pattern: Sound warning
Enki Mobile Application
(The Lexman charging station
must be connected to the Internet)
Start / Stop
Charge status
Usage and consumption history
Remote access management to charging
Charge unlocking
Scheduling
Protection Internal protection: 6mA RCD-DD compliant with IEC 62955
Internal temperature derating
Connector for current emission coil
Required for installation (not included):
Type A or Type F residual current circuit breaker, 30mA
6kA magnetic-thermal circuit breaker, curve C
Cable gauge and section vary depending on site characteristics
and local regulations
16A → protection rating = 20A
Cable section = 6mm²
32A → protection rating = 40A
Cable section = 10mm²
Mechanical Product dimensions: H455xW275xD151
Weight: ~4.5kg
IP55
IK10
Material: PC / ASA
Front color: RAL 9003
Back color: RAL 7024
Packaging: H460x W360x H250 (90235808)
Packaging: H460x W360x H180 (90235807)
Mounting Wall mounting plate
Optional Accessories Operating: -30 to 50°C, Humidity 5 to 95%
(Power reduction may occur)
Storage: -30/ 50°C
Indoor and outdoor use
Maximum altitude: 2500m
Interface Smart meter for load balancing
Single-phase: SDM120CT-100A - Dynamic anti-disconnection load module for single-phase installation without TIC interface (France)
Three-phase: SDM630MCT-100A
Dynamic anti-disconnection load module for three-phase installation
without TIC interface (France)
Interface Ethernet, Wi-Fi, USB, Modbus RTU
Protocol OCPP 1.6j
RS485

 

  16A max/ phase 32A max/ phase
Rating 20A 40A
Cable Section 6mm² 10mm²

Danger.png To pair the device, your Wi-Fi network must be configured with WPA2 on the 2.4 GHz frequency.
If your 2.4 GHz Wi-Fi network is mixed with 5 GHz, 6 GHz, or 7 GHz frequencies, it is essential to separate the bands and assign a distinct SSID (Wi-Fi network name) to each frequency. Danger.png

 

How to Install the Charging Station:

 

Product Functionality in the ENKI Application:

Device Functionality Properties Scenario Integration
Actions Triggers Conditions
Start / Stop Charging Charge or stop charging the car
History Check charging, connection, and disconnection history
Remote Control Allow remote control of the station
Cable Unlock Force unlocking of the charging cable from the station
Check / Perform Available Updates

OTA update available

Retrieve Firmware Version

Retrieve and display the current firmware version of the device

Borne de recharge Lexman - Application 01.png Borne de recharge Lexman - Application 02.png Borne de recharge Lexman - Application 03.png Borne de recharge Lexman - Application 04.png Borne de recharge Lexman - Application 05.png
Control Page Settings

 

Product Overview:

Borne de recharge Lexman - Vue du produit.png

Item Part Description Item Part Description
1 Enclosure 8 Communication Board
2 Decorative Plate 9 LED Board
3 Front Cover 10 Charging Socket Power Supply
4 Flap 11 Contactor
5 Indicator Light 12 Lower Power Cable Entry
6 Charging Socket or Socket Holder 13 Upper Power Cable Entry
7 Power Board 14 Optional Signal Cable Entry 1 + 2

 

Borne de recharge Lexman - Vue du produit 02.png

The Lexman charging station is capable of charging any electric vehicle equipped with a type 2 connector Borne de recharge Lexman - Vue du produit 04.png

Borne de recharge Lexman - Vue du produit 03.png

 

What Does the LED Status of My Device Mean:

Borne de recharge Lexman - Voyant - Jaune clignotant (Démarrage).gif Borne de recharge Lexman - Voyant - Vert et blanc clignotant (Prête à être initialisé).gif Borne de recharge Lexman - Voyant - Vert fixe (Disponible).gif Borne de recharge Lexman - Voyant - Vert cligntoant (Charge en préparation).gif Borne de recharge Lexman - Voyant - Vert fixe, bleu clignotant (Prêt à charger, en attente d'autorisation).gif Borne de recharge Lexman - Voyant - Bleu flux descendant (Charge en cours).gif
Flashing Yellow Flashing White and Green Solid Green Flashing Green Solid Green, Flashing Blue Blue Flowing Light
Startup
Or software update
Duration: 1 to 5 minutes
The station is ready to be initialized The station is available. Charging preparing Ready to charge, waiting for authorization Charging in progress
Or charging session
started, waiting
for the scheduled
charging slot
Borne de recharge Lexman - Voyant - Bleu respirant (Fin de charge).gif Borne de recharge Lexman - Voyant - Bleu fixe (Planning de charge activé).gif Borne de recharge Lexman - Voyant - Bleu et rouge fixe (Chargeur vérrouillé).gif Borne de recharge Lexman - Voyant - Blanc clignotant toutes les 4s (Hotspot activé).gif Borne de recharge Lexman - Voyant - Rouge clignotant (Une erreur s'est produite).gif Borne de recharge Lexman - Voyant - Rouge fixe (Anomalie).gif
Breathing Blue Solid Blue Solid Blue and Red White flashing once every four seconds Flashing Red Solid Red
End of charge Charge scheduling
activated
Charger locked
by the user from
the configuration interface
Note: This state is
normally not
accessible under
normal conditions
(use with ENKI connected station)
Wi-Fi Hotspot activated
(~1h)
Connection to the configuration
interface via Wi-Fi possible
An error occurred, please retry
the charging sequence.
Internal error or incorrect installation
Contact the installer
or your reseller's customer service

 

How to Reset My Device?

Perform a Reset of My Connected Device

 
# Power off the station via the electrical meter. Open the charging station and set the power board selector to 9. Then restart the Lexman station, the indicator light will flash yellow.
 
Borne de recharge Lexman - Effectuer un reset 01.gif Borne de recharge Lexman - Effectuer un reset 02.gif Borne de recharge Lexman - Effectuer un reset 03.gif
Power off the station. Set the selector to 9. Power on the station. The light flashes yellow.
 
# Wait five minutes. After this delay, power off the station again, then set the selector to the desired current. Finally, power on again. Your station has been successfully reset.
 
Borne de recharge Lexman - Effectuer un reset 04.gif Borne de recharge Lexman - Effectuer un reset 05.gif Borne de recharge Lexman - Effectuer un reset 06.gif
Wait 5 minutes. Then power off the station. Set the selector to the desired current. Power on the station. The station is reset.

 

Borne de recharge Lexman - How to reset.gif

 

Technical Documents / User Manual


Related articles

Submit a request