Schedules allow you to automate your device's operation by defining personalized heating schedules.
- Activate or deactivate a schedule:
- If a schedule is running, its button is red:
. Press this button to deactivate it.
- To activate another schedule, press its green button:
- If a schedule is running, its button is red:
- Modify a schedule: Press the name of the schedule to modify to access its modification screen.
- Create a new schedule: Press the + button and configure the new schedule to your liking.
Useful information:
- You can have up to 10 different schedules.
- Only one schedule can be active at a time.
- If you switch to "Prog" mode directly from the water heater, the "Default Schedule" will be activated. This schedule is pre-configured and can be modified, but cannot be renamed.
Related articles :
- Set up your dimmer switch
- Edit a time slot in a water heater schedule
- Day of the week for your water heater schedule
- Create/modify a schedule for your water heater
- Configure Your Roller Shutter
- Set up schedules for your device
- Control boiler
- Minimum operating hours
- Pairing Gateways
- Temperature calibration